---
title: "Select a Period"
url: "https://kb.chargeplanner.ai/en/article/select-a-period"
language: "en"
last_updated: "2025-07-03T09:38:27.615Z"
---

# Select a Period

After choosing the type of project you want to create, you have to decide **which period you want to base your project on**. There are two types of references to choose from:

-   **Baseline**: period on which your baseline network is based
-   **Simulation**: period where you made changes to the network. You can find there your simulations previously saved using the Location Planning module (you can learn how to save a simualtion in this [article](https://kb.chargeplanner.ai/en/article/how-to-save-share-manage-your-simulations#saving-simulations)).

Once you have made your choice, you can click on the '**Next**' button to confirm your choice and move on to the next step.

![](https://cdn-assets.productfruits.com/25fcf422-aee6-48ef-b7c6-ead032dfc0be)

You are ready to go to the next step: [**Select a data set**](https://kb.chargeplanner.ai/en/article/choose-a-data-set)**.**
